MSI
SKU:9S6-XP0111-006
MSI Smart EV Charger EV Life, IEC 62196-2 Type 2 charging gun, 7.4 kW/32A, Bluetooth, IP55 and IK08, EV Life app controls charging on the smart phone
MSI Smart EV Charger EV Life, IEC 62196-2 Type 2 charging gun, 7.4 kW/32A, Bluetooth, IP55 and IK08, EV Life app controls charging on the smart phone
Couldn't load pickup availability
Special Offer: Bundle & Save
Buy 2
Buy 3 or More
MSI Smart EV Charger EV Life
Charging gun IEC 62196-2 Type 2, Up to 7.4 kW/32A output
Plug and Play! Connect via Bluetooth to MSI EV Life EV Charger, and in less than 60 seconds, ready to
easily start charging
Compliant with RCM, CNS 15511, UL2594 and IEC 61851
Exclusive EV Life app controls your charging on the smartphone
IP55 and IK08 compliant to withstand wind and rain, suitable for indoor or outdoor application
Meet the ASTM B117 Standard, providing superior rust resistance. You can count on our chargers to thrive
in salt-air environments, such as coastal areas, for at least 3 years.
Capable of reliably operating in conditions up to 55°C, ensuring consistent performance and dependable
charging even in Australia’s most intense heat.
WW First and only one 3000m altitude certification to ensure normal operation in high-altitude areas
Provide product liability insurance worth five million USD, covering any property damage caused by
product issues.
100% Safety Protection
At MSI, we don’t just talk the talk; we’re serious about your safety. With a
solid five million dollars (USD) in liability insurance covering any
property damage due to product issues, we’re delivering a truly worry-free
charging experience. Rest easy knowing you, your car, and your home are
protected – no worries.
Built Tough to weather the Elements
Rain, hail, or shine – our MSI EV Charger is up for the
challenge. Designed with the Australian outdoors in mind, this
charger sports an IP55 rating for water and dust protection. So
even if Mother Nature has other plans, your charge is
guaranteed to keep going when you need it most.
Built to Last
Sure, it’s sleek and stylish, but the MSI EV Charger is as rugged
as they come. Thanks to IK08 impact protection, your charger is
ready to shrug off life’s bumps and bruises. With MSI,
durability meets style, meaning you’ll get where you’re going
without any hiccups.
Superior Corrosion Resistance
Enjoy living near the beach? No worries. MSI’s EV Charger is
made to survive the harshest of environments, exceeding the
ASTM B117 Rust Corrosion Resistance Standards. Whether
you’re charging by the coast or in the heart of the outback, count
on us for long-lasting performance.
Extreme Heat Resistance
Australian summers can be scorching, but MSI’s EV Charger
handles it with ease. Designed to withstand temperatures up to
55°C in direct sunlight, it keeps your EV cool and charged when
the mercury rises. Where other chargers need a breather, MSI
keeps charging.
Plug and Play
With the MSI EV Life app, charging couldn’t be simpler.
Connect via Bluetooth, control your charger, view stats, and
access advanced features, all in one place. Just plug in and enjoy
peace of mind knowing that MSI’s got you covered.
Compatible with All EVs
Unlike other chargers that restrict you to certain models, MSI’s EV
Charger is compatible with all EVs, whether BEV or PHEV. We’re not
here to play favorites – just plug in, and go. Plus, with the Type 2
charging gun, it’s fully compliant with Australian EV standards.
High- Reliability
MSI’s industry-leading technology meets and exceeds Australian
and global standards. Backed by our liability insurance, every charge
delivers the reliability you expect and the performance you deserve.
MSI EV Life APP
Take your charging experience to the next level with the MSI EV
Life app. Enjoy features like advanced scheduling to avoid peak
rates and current control for tailored charging speeds that help
protect your EV’s battery. From setup to advanced control, it’s
all in the palm of your hand.
UPC: 824142389270
Share
